• Residential Development, High Road, Guyhirn, Cambridgeshire
    Due to the past uses of the site and the sensitivity fo the proposed development (residential) nature of the site a contaminated land planning condition was attached to the decision notice which required that potential sources of contamination need to be investigated before the development commences. The first stage of discharging the condition was to […]
  • 250 Creek Road March Cambridgeshire PE15 8RY
    Residential Redevelopment of a Workshop, March, Cambridgeshire
    In order to demonstrate that after the development the site could not be classified as ‘contaminated land’ under Part 2A of the Environmental Protection Act a Phase I desk study report was required to support the application for the erection of a dwelling.  The site was occupied by an agricultural building, the past use of […]
  • 118 Wisbech Road March Cambridgeshire PE15 8EU
    Residential Development, Wisbech Road March Cambridgeshire
    Given the sensitive nature of the development (residential) and the history of the site a contaminated land planning condition was attached to the decision notice for the proposed development. The first stage of discharging the condition was to prepare a Phase I desk study report in order to determine if the site has the potential […]
  • Site Of Former 125 Burrowmoor Road March Cambridgeshire Back to search results Track
    Residential Development, Burrowmoor Road, March, Cambridgeshire
    Due to the sensitive nature of the development the planning authority attached a contaminated land planning condition to the decision notice for the proposed development. The first part fo the condition required a desk study report.   A desk study determines what issues relating to historical contamination may affect the site, this is undertaken by […]