Head Office: Hanover House, Hanover Street, Liverpool, L1 3DZ.
  •  0151 521 2539
  •  enquiries@demeter-environmental.co.uk
  • Home
  • About Us
  • Services
    • Contaminated Land Planning
    • Phase I Desk Study
    • Phase II Site Investigation
    • Phase III Validation of Remediation
    • Coal Mining Risk Assessment
    • Geotechnical Site Investigation
  • Case Studies
  • Testimonials
  • Blog
  • Contact Us

  • Conversion Of An Agricultural Building To A Dwelling (Permitted Development), Sallow Lane, Snetterton, Norfolk, NR16
    In order to support the prior approval for the change of use of the agricultural building to a dwelling a Phase I Desk Study report was required to assess the potential contamination risks on the site. A desk study determines what issues relating to historical contamination may affect the site, this is undertaken by reviewing […]
  • Permitted Development for the Change of Use From Agricultural to a Dwelling
    In order to support a prior approval application (3PN/2016/0014/UC) for the conversion of the existing buildings to a dwelling a desk study report was required to determine if the site had the potential to be impacted by elevated levels of contamination arising from the historical uses of the site. The review of the historical O.S […]
  • Land off Crown Road IP26 5HG
    Residential Redevelopment of Former Haulage Yard, Mundford, IP26
    Given the industrial legacy of the site (former haulage yard) a desk study report was required to support the application for the erection of a number of dwellings in order to demonstrate the site could be made ‘suitable for use’ and could not be determined as being contaminated land under Part IIA (requirements of the […]
  • Threshing Yard Barn Hallfield Road IP24 1PT
    Permitted Development Change Of Use From Agricultural Building To A Dwelling, Hallfield Road, IP24
    In order to demonstrate that after the development the site could not be classified as ‘contaminated land’ under Part 2A of the Environmental Protection Act a Phase I desk study report was required to support the application for the erection of a dwelling.  The site was occupied by an agricultural building, the past use of […]
  • Head Office

    Ropewalks,
    301 Tea Factory
    St Peters Square
    Fleet Street
    Liverpool
    L1 4DQ
    0151 521 2539
    brighton@demeter-environmental.co.uk
  • Brighton Office

    Gemini House
    136-140 Old Shoreham Road Brighton
    East Sussex BN3 7BD
    01273 741 727
    brighton@demeter-environmental.co.uk
ISO 45001
Copyright ©2008-2023 Demeter Environmental Ltd.
Company Number 07010088 VAT Number 158 1690 89