In order to support the application for the residential redevelopment of the site Demeter Environmental were commissioned to prepare a desk study report for the site.

The desk study identified that the site comprised of a garden (northern area) and a works which was erected between 1973 and 1985. A scrap yard was identified as forming the northern boundary of the site.

The walkover survey revealed that the works was currently used to restore classic cars.

A previous site investigation report was provided by the client, which was incorporated into the desk study report and was used to refine the preliminary conceptual model.

Given the use of the site as a works and the scrap yard on the northern boundary a Phase II investigation was proposed in the desk study report.

The desk study report can be accessed here, and the memo accepting the report here.

  • Head Office

    Hanover House
    Hanover Street
    Liverpool L3 3DZ
    0151 521 2539
    0151 909 3661
    enquiries@demeter-environmental.co.uk
  • Brighton Office

    Gemini House
    136-140 Old Shoreham Road Brighton
    East Sussex BN3 7BD
    01273 741 727
    brighton@demeter-environmental.co.uk