Brookfield Farm, Tabley Lane, Higher Bartle, Preston, Lancashire, PR4 0LH

Residential Development, Higher Bartle, Preston, Lancashire

Case Study Reference: 15-05-06

Planning Authority: Preston City Council

Planning Reference: 06/2016/0002

Synopsis:

In order to support the application for the erection of thirteen dwellings a Phase I Desk Study Report was required. Demeter Environmental were commissioned to prepare the desk study report.

The review of the historical O.S. maps revealed the presence of a pond on the site between 1846 to 1960 and well as an orchard circa 1955, a number of in-filled ponds within 250m of the site were also identified from the O.S.maps.

The report concluded that as part of the development the materials used to in-fill the pond should be investigated as well as the incorporation of gas protection measures.

The desk study report can be accessed here and the memo accepting the desk study report can be accessed here.

  • Head Office

    Hanover House
    Hanover Street
    Liverpool L3 3DZ
    0151 521 2539
    0151 909 3661
    enquiries@demeter-environmental.co.uk
  • Brighton Office

    Gemini House
    136-140 Old Shoreham Road Brighton
    East Sussex BN3 7BD
    01273 741 727
    brighton@demeter-environmental.co.uk