Synopsis:

Demeter Environmental Ltd were commissioned to prepare a Desk Study report to discharge the contaminated land planning condition for the erection of two dwellings.

The contaminated land planing condition was attached due to the sensitive nature of the proposed development.

The Desk Study report identified a number of potential issues (garage and a infield pond) on and within 250m of the site. The walkover survey demonstrated the absence of made ground on the site.

The qualitative risk assessment also indicated that the off site sources of ground gases were not credible, and the Desk Study Report did not propose any further works.

The memo accepting the recommendations of the Desk Study Report can be accessed here.

  • Head Office

    Hanover House
    Hanover Street
    Liverpool L3 3DZ
    0151 521 2539
    0151 909 3661
    enquiries@demeter-environmental.co.uk
  • Brighton Office

    Gemini House
    136-140 Old Shoreham Road Brighton
    East Sussex BN3 7BD
    01273 741 727
    brighton@demeter-environmental.co.uk