Erection of a Detached Dwelling, Greenfield, Oldham
Case Study Reference: 14-03-09
Planning Authority: Oldham Council
Planning Reference: PA/334866/13 and PA/334866/13
Synopsis:
To support the erection of a dwelling a desk study report was required.
Demeter Environmental were commissioned to prepare the desk study report and whilst a number of potential sources of contamination were identified, all were discounted as part of the qualitative risk assessment undertaken as part of the report which concluded that there were no issues relating tot he development of the site and no further works were required.
The desk study report can be accessed here.