• Erection of Three Dwellings, Thorne, Doncaster, DN8
    Due to the sensitivity of the development and information held by the local authority a contaminated land planning condition was attached the proposed development.       The first stage of discharging the condition was the preparation of the desk study report. Initially the history of the site was researched using a combination of historical […]
  • Erection of a Dormer Bungalow Following the Demolition of the Existing Buildings, Littleworth Lane, Rossington, Doncaster, DN11
    Given the sensitivity of the proposed development, a contaminated land planning condition was attached to the decision notice for the application for the erection of a dwelling. Demeter Environmental were commissioned to prepare a desk study report for the discharge of Condition 3a (Phase I Desk Study report). Initially the history of the site and […]
  • Stainforth Road Barnby Dun Doncaster South Yorkshire DN3 1AL
    Erection of Replacement Dwelling, Barnby Dun, Doncaster, South Yorkshire
      Given the sensitive nature of the development (residential) and that the iste was located adjacent a closed landfill site a contaminated land planning condition was attached to the decision notice for the proposed development. The first stage of discharging the condition was to prepare a Phase I desk study report in order to determine […]
  • Erection of a Dwelling Adjacent to a Limestone Quarry, Stainton, Rotherham
    A desk study report was prepared by others to discharge the contaminated land planning condition for the site.  This report was submitted and a number of issues were raised in regards to the content of the report. At the time of being commissioned the dwelling had been erected and gas protection measures had been incorporated […]